Friday, November 11, 2011

Quick update

Just a quick update on my visit yesterday. It looks like the foundation, waterproofing and plumbing is finished and they're getting ready to frame.


The Venice next door is completely framed, and they're working on the foundation for the house on the other side of us.
The view from the culdesac shows the 4 houses at the bend (Florence, Venice, Milan-Us, and ?) and one Venice at the top of the street.This view shows the 4 houses in the culdesac (the Venice, 2nd from the right closed this week).
I'm going to try to stop by tonight and check on progress. More pics to come.

Wednesday, November 9, 2011

First Purchase for the New House

We made our first official purchase for the new house this weekend. After 3 hours sitting on every sofa/sectional in Macy's, we finally made a decision for the family room. We ordered the sofa, loveseat, chair and ottoman.
We decided to order this now because we selected a non-stock fabric option so production time is 8-12 weeks. It's actually a little more tan/brown than it looks in the swatch. We didn't want to go with a micro-suede, so the one we chose is more of a chenille (which gives the color more texture and dimension).
The saleswoman at Macy's was great and gave us the Friends and Family pricing (which doesn't start until the end of November). She's also going to link all of the sales receipts together so when we buy our other furniture we'll only pay shipping one time.

We still haven't decided on the dining room, bedroom or office yet. They're supposed to be getting a new bedroom set in this week that I've only seen online but think that I like. We'll probably buy the rest of the furniture during the F&F sale because by then we should have a closing date. We're really into Black Friday shopping, so we're planning to try to get appliances taken care of then.

Now that the family room furniture is selected I can start looking at paint colors and decide on the finish/color of the tables and entertainment unit.

We've had pretty good weather this week, it didn't start raining until this evening and should be clear tomorrow and Friday. I'm going to try to stop by tomorrow afternoon and over the weekend. I really hope that I can see progress (it seemed like our neighbors house sat as just foundation for 2+ weeks). If everything went as planned this week the PM estimated framing would start tomorrow, so fingers crossed.

Monday, November 7, 2011

Moving right along

On Saturday we went to the model to meet some of our new neighbors. There were probably 5-6 couples there and I'm pretty sure everyone had a toddler/baby except for us. The people we met were really nice and it seems like it's going to be a great neighborhood.

After we left we walked around the lot and I was able to get pics of the foundation. This is from the back corner of the house (driveway on the left). We have 2 unfinished storage areas and a half bath in the basement, so the finished basement will still be an "L" shape, but it will also be a little more square.
Dan was checking out the egress window. We didn't want it in the finished section or along the back of the house and were really glad to see they were able to move it to the unfinished storage area).
Here's the view from the back of the house. I'm pretty sure one of the lots across the street sold and is going to be a Brighton.
We found out the neighbors are building a Venice, which makes 4 on the street so far. I'm not sure what the neighbors on the other side of us are building (they were out of town this weekend so we didn't get a chance to meet them). Here's an updated shot of our neighbors- Florence, Venice then our Milan.
The first completed house closes this week and then there's another in 3 weeks. The SR said they're currently on April deliveries.

I texted the PM today since it's been 3 weeks since I've heard from him. Got a quick reply saying that they're finishing up plumbing, groundworks and backfill by Thursday and that they should start framing Friday. I'm not really sure what groundworks and backfill are, but I'll google those later. I'm just so excited that we're this close to framing!!

Wednesday, November 2, 2011

Hole, Footers, Foundation

Dan and I stopped by over the weekend and saw that they had finished digging and that they had started prepping for the footers. It was pretty dark, freezing cold and muddy, so not an ideal time to take pics, but I did get one of Dan standing in the future garage.
I stopped by on Sunday to check everything out in the daylight. I've read that sometimes it seems like the hole/footers look small compared to the actual size people expect, but I thought our hole looked huge. We'll see what it looks like once the foundation is completed.

Speaking of foundation...I stopped by this afternoon and they had just started working on it. I talked to one of the workers for a minute and he said they poured the footers yesterday and should have the foundation finished this week (we're supposed to have good weather until next Tuesday). He also confirmed that our wood was delivered (it wasn't there on Sunday).

There it is, the wood for our house! It's sitting behind our neighbor's lot because the other neighbor's wood is behind ours (they were working on their plumbing today so framing should start soon for them). I need to remember to keep a pair of flats in the car so that I can walk onto the lot and take some close-up pictures.

It's crazy to think about the progress that has been made since this summer. The lots on our street were released for sale at the end of June. This picture is from the 3rd week of August, right before our street was paved.
And now, approximately 10 weeks later our street looks like this!
5 houses completely framed, 2 with framing in progress and 2 or 3 with foundations started.
I'm really bad with being able to tell what model the houses are but I think there is a Naples and 2 Venices in the culdesac, then another Venice at the top of the street on the right and a Florence 2 doors down from us (middle of the street, left side).
There's a little party at the model this weekend, I can't wait to finally meet some of our neighbors (we met one couple back in August- from the Florence 2 doors down).

Thursday, October 27, 2011

More Digging

Right now we live about 30 minutes from our plan and I try to get out there twice a week. Luckily I have clients nearby so I can usually stop by before or after meetings.

I stopped by today and wasn't expecting to see much work since it has been raining all day. They were actually digging when I stopped by. I couldn't take any pictures because the guys were on the lot working and we're not supposed to take photos of them. It looked like the hole was significantly deeper.

The weather should be nice the next few days and into next week so hopefully we'll have more than just a hole by next week.

I'm wondering when we should expect to start receiving weekly updates from the PM. I called him about 11 days ago when our digging hadn't started yet, that was Monday of last week. I'm thinking we haven't heard from him because there hasn't been much to report. Any thoughts?

Sunday, October 23, 2011

They started digging

We had the pre-construction meeting a few weeks ago, I just haven't had much time to post an update. Everything went well and our estimated close date is January 4th. Our initial dig date was Oct 5, then when we had our pre-construction meeting it was set for Oct 12. We had some rain the week of the 12th and they had to finish up on a few other foundations that were already started, so we got bumped to this past week. I stopped by on Wednesday and we finally had a hole.

We still haven't closed on our current house, but we've been told once again it "should happen this week." That's been a bit stressful, so it was a nice relief to see that digging had actually started this week.

Our plan is made up of multiple builders, but each has their own entrance and streets. The Ryan section has one completed street and then our street that was just released for sale in June and paved in August. There are already 3 houses framed (closings in Nov), 3 or 4 with foundations (closing in Dec) and 2 or 3 with holes (closing in January). It's crazy to see how much the street has changed in the past 2 months, especially because when I stop by I hardly ever see people there working.

We're kind of in the middle of the street and by the time we close in January the 2 houses to our right will already be completed and occupied, and the house to our immediate left will be finishing up a few weeks later. Seeing everything staked off and houses going up, we're really glad we chose our lot instead of one on the culdesac. Those lots have hardly any yard, and with the area they cleared behind our house, we're actually going to have a decent sized back yard. Dan was a little concerned about the lack of privacy with townhouses right above us, but we walked through their yards and its actually really hard to see into our yard from the top of the hill.

Our Lot

Our lot, our 2 neighbors and the townhouses above us.
Our lot, the neighbors, and the townhouses.
Our street. We'll be 2 doors down from the house on the left.

We spent some time last weekend looking at furniture again. I changed my mind on the dining room set because I want something a little bigger. The china cabinet is 2 pieces, I haven't decided if I want both, or just the credenza. Dan met me at the store to check out a closeout floor model set for the gameroom. After spending about an hour comparing every leather sofa and sectional in the store, we decided on a sectional. As I was talking to the saleswoman, Dan wandered over to a sectional we completely skipped over because it had recliners and consoles with cup holders. Of course it was the most comfortable couch we sat on all day and we changed our mind. It's really for a home theater, and since our game room will be primarily used for movies, sports and xbox we decided to go with it. Each seat is a "power recliner," and they're all separate pieces which should make it easy to get into the basement since we don't have a walk-out. We're going to add a 5th seat to the center section which makes it a little over 14'. I stopped by the model to make sure it would fit; we have to change the layout we were planning and move the tv to a different wall, but it will definitely work.

I'm hoping to update more regularly now that the building process has actually started and I'm halfway through my busy season for work. The weather should be pretty good this week so I hope to have a lot more to report about our progress.

Monday, September 19, 2011

It's been a while

Not much to report on the new house front. There's one house on our street that is already framed, and it looks like framing will start soon on the house 2 doors down from us. They also finally have the lot signs posted, but it was dark and I couldn't get a good shot. Our pre-con meeting is October 5th, I can't wait.

We're still trying to pack our current house and we're getting down to crunch time. I ended up getting 3 mobile storage units (plus we already have one). It's a little more expensive, but I just think the convenience is definitely worth it. Dan spent the day cleaning the garage out, we were both shocked at how much junk we had in there. It didn't look like a lot since everything was around the perimeter and the car fits fine, but the garbage men are going to hate us this week. I'm just really glad that I'll have a separate storage area in the new house for all of my work stuff (I have an event planning biz so lots of random supplies to store). We've sold some furniture, but still have a few larger pieces to sell. We still don't have a closing date, but the estimated date is "by the end of September."

We need to start making a list of everything we need to buy, refrigerator, washer, dryer, light fixtures, etc and the projects we want to do immediately. I've read about people painting the garage and sealing the floor, but I don't know if we'll be able to do that in January with the temperature. I know there are some organizational projects I want to do too before we put anything away (kitchen, closets, garage, basement).